Method
Ten weeks. One production system.
Every engagement runs the same shape. Predictable, transparent, no theater.
wk 0
Scope
A working session, not a sales call. We map the operation, identify the highest-leverage loop, agree on what done looks like.
wk 1–2
Embed
A senior operator joins your team in your tools. Reads the tickets, sits in the standups, finds the actual bottleneck, not the reported one.
wk 3–4
Re-architect
Workflow redesigned around what models do well. Spec written, owners assigned, evals defined before a line of code ships.
wk 5–8
Ship
Production system with monitoring, fallbacks, human-in-loop where it matters. Iterated against real volume, not synthetic tests.
wk 9–10
Hand-off
Runbook, on-call rotation, internal champion trained. We leave. The system stays, owned and understood by your team.